LoadFlowLogistics OS v0.9

Admin

Active Tenant Workspace

Overview
  • Dashboard
  • Schedule
Operations
  • Load Plans
  • Deliveries
  • Recommendations
  • Load Optimizer
  • CSV Import
Fleet
  • Trucks
  • Drivers
Workspace
  • Settings
  • Guide
D

Demo

demo@loadflow.app

LoadFlowDashboard
Admin
OverviewPlansDeliveriesFleetSchedule

Admin • Live Operations

Operations Control Center

Real-time dispatch pipeline, fleet availability, and load plan execution across your workspace.

Recommend FleetNew DeliveryCreate Load Plan
Today (Nov 12, 2026):0 load plans scheduled today•0 ready for dispatch•13 overdue unassigned deliveries•2 active plans missing driver
Dispatch Schedule Multi-Load Optimizer

Operational Exception Center

Live dispatch blockers, overdue orders, capacity violations, and resource conflicts derived from active company data

CriticalPlan #EEF956— Plan contains non-dispatchable deliveries

"Metro Office Supplies" is PENDING; "Garden Grove Nursery" is PENDING. Only ASSIGNED deliveries can be dispatched.

Metro Office SuppliesGarden Grove Nursery
Fix allocation
CriticalPlan #EEF956— Plan date passed without dispatch

Plan #EEF956 was scheduled for Jun 13 but is still DRAFT.

Box Truck 01James Rodriguez
Review plan
CriticalPlan #850D00— No driver assigned

Plan #850D00 (Jun 16) cannot be dispatched until a driver is assigned.

Heavy Hauler 06
Assign driver
CriticalPlan #1C9674— Plan date passed without dispatch

Plan #1C9674 was scheduled for Jun 16 but is still DRAFT.

Box Truck 01David Park
Review plan
CriticalPlan #850D00— Plan date passed without dispatch

Plan #850D00 was scheduled for Jun 16 but is still DRAFT.

Heavy Hauler 06
Review plan
CriticalPlan #E9706F— No driver assigned

Plan #E9706F (Jun 17) cannot be dispatched until a driver is assigned.

Heavy Hauler 06
Assign driver
CriticalPlan #E9706F— Plan date passed without dispatch

Plan #E9706F was scheduled for Jun 17 but is still DRAFT.

Heavy Hauler 06
Review plan
CriticalDjjd— Delivery overdue and unplanned

Djjd was scheduled for Jun 22 and is still not on a load plan.

Plan delivery
CriticalSPRINT8_TEST_ALPHA— Delivery overdue and unplanned

SPRINT8_TEST_ALPHA was scheduled for Jul 25 and is still not on a load plan.

Plan delivery
CriticalSPRINT8_TEST_BRAVO— Delivery overdue and unplanned

SPRINT8_TEST_BRAVO was scheduled for Jul 26 and is still not on a load plan.

Plan delivery
CriticalSPRINT8_TEST_CHARLIE— Delivery overdue and unplanned

SPRINT8_TEST_CHARLIE was scheduled for Jul 27 and is still not on a load plan.

Plan delivery
CriticalSPRINT8_TEST_DELTA— Delivery overdue and unplanned

SPRINT8_TEST_DELTA was scheduled for Jul 28 and is still not on a load plan.

Plan delivery
CriticalPlan #FD4BDA— Plan date passed without dispatch

Plan #FD4BDA was scheduled for Jul 28 but is still DRAFT.

testJames Rodriguez
Review plan
CriticalPlan #FBE950— Plan date passed without dispatch

Plan #FBE950 was scheduled for Jul 28 but is still DRAFT.

Sprinter Van 05David Park
Review plan
CriticalSPRINT11_PREVIEW_ECHO— Delivery overdue and unplanned

SPRINT11_PREVIEW_ECHO was scheduled for Aug 2 and is still not on a load plan.

Plan delivery
CriticalSPRINT11_PREVIEW_FOXTROT— Delivery overdue and unplanned

SPRINT11_PREVIEW_FOXTROT was scheduled for Aug 3 and is still not on a load plan.

Plan delivery
CriticalSPRINT11_PREVIEW_GOLF— Delivery overdue and unplanned

SPRINT11_PREVIEW_GOLF was scheduled for Aug 4 and is still not on a load plan.

Plan delivery
CriticalSPRINT11_PREVIEW_HOTEL— Delivery overdue and unplanned

SPRINT11_PREVIEW_HOTEL was scheduled for Aug 5 and is still not on a load plan.

Plan delivery
CriticalSPRINT11_PREVIEW_INDIA— Delivery overdue and unplanned

SPRINT11_PREVIEW_INDIA was scheduled for Aug 6 and is still not on a load plan.

Plan delivery
CriticalSPRINT11_PREVIEW_JULIET— Delivery overdue and unplanned

SPRINT11_PREVIEW_JULIET was scheduled for Aug 10 and is still not on a load plan.

Plan delivery
CriticalSPRINT11_PREVIEW_LIMA— Delivery overdue and unplanned

SPRINT11_PREVIEW_LIMA was scheduled for Aug 12 and is still not on a load plan.

Plan delivery
CriticalSPRINT11_PREVIEW_NOVEMBER— Delivery overdue and unplanned

SPRINT11_PREVIEW_NOVEMBER was scheduled for Aug 14 and is still not on a load plan.

Plan delivery
WarningPlan #A27A22— Dispatched plan not completed

Plan #A27A22 was dispatched for Jun 12 and has not been marked completed. Truck and driver stay locked until it is.

Flatbed 03Maria Santos
Complete plan
WarningPlan #E9E47A— Dispatched plan not completed

Plan #E9E47A was dispatched for Jun 12 and has not been marked completed. Truck and driver stay locked until it is.

Box Truck 02Ahmed Khalil
Complete plan
InfoPlan #EEF956— Plan has no deliveries to ship

Plan #EEF956 (Jun 13) has no assigned deliveries and cannot be dispatched.

Box Truck 01
Allocate deliveries
InfoPending queue— Deliveries awaiting allocation

2 pending deliveries are not yet on a load plan (not due within 2 days).

Open optimizer
Pending Deliveries

15

11 assigned to plans

In Transit

6

2 dispatched plans

Active Load Plans

8

Delivery Pipeline

Current status distribution across all orders

All Deliveries →
Total Deliveries42
Pending15
Assigned11
In Transit6

Active & Upcoming Load Plans

Plans currently in DRAFT, READY, or DISPATCHED state with live capacity utilization

OptimizerView All (10)
Plan / DateTruck & DriverCapacity UtilizationStatus
Plan #E9E47A
Jun 12, 2026 • 2 stops
Box Truck 02 (BXT-102)

6 draft • 0 ready • 2 live

Available Trucks

6 / 9

2 in use • 1 maint.

Available Drivers

5 / 9

3 on trip • 1 off duty

Delivered Orders

10

24% of 42 total

Delivered
10
Cancelled0

Load Plan Lifecycle

Plans by operational lifecycle stage

All Plans →
Total Load Plans10
Draft6
Ready0
Dispatched2
Completed2

Fleet Readiness

Vehicle availability and maintenance status

Manage Fleet →
Registered Trucks9
Available6
In Use2
Maintenance1
Driver: Ahmed Khalil
3,240 kg / 8,000 kg41%
Dispatched
Plan #A27A22
Jun 12, 2026 • 2 stops
Flatbed 03 (FLT-201)
Driver: Maria Santos
13,450 kg / 15,000 kg90%
Dispatched
Plan #EEF956
Jun 13, 2026 • 2 stops
Box Truck 01 (BXT-101)
Driver: James Rodriguez
3,830 kg / 8,000 kg48%
Draft
Plan #1C9674
Jun 16, 2026 • 1 stop
Box Truck 01 (BXT-101)
Driver: David Park
1,300 kg / 8,000 kg16%
Draft
Plan #850D00
Jun 16, 2026 • 3 stops
Heavy Hauler 06 (HH-501)
Driver unassigned
1,735 kg / 25,000 kg7%
Draft
Plan #E9706F
Jun 17, 2026 • 1 stop
Heavy Hauler 06 (HH-501)
Driver unassigned
1,000 kg / 25,000 kg4%
Draft

Unassigned Delivery Queue

Pending orders awaiting assignment to a draft load plan

Import CSVView Queue (15)
Customer / DestinationScheduledWeight
Djjd
Sjdj
Jun 22, 202650 kg
SPRINT8_TEST_ALPHA
Phoenix Mall, Pune
Jul 25, 2026126 kg
SPRINT8_TEST_BRAVO
Navi Mumbai Hub
Jul 26, 202678 kg
SPRINT8_TEST_CHARLIE
Hinjawadi Phase 2
Jul 27, 2026210 kg
SPRINT8_TEST_DELTA
Magarpatta City
Jul 28, 202696 kg
SPRINT11_PREVIEW_ECHO
Airport Cargo Terminal
Aug 2, 2026143 kg